Aeroderivative gas turbines
GE LM series
- LM1600
- LM2500
- LM5000
- LM6000
At MFS, we understand that proper commissioning is critical to the long-term performance and reliability of your gas turbine. Our team of highly skilled and motivated engineers brings years of hands-on experience in installation and commissioning, ensuring your system starts strong and stays that way.
Commissioning a gas turbine involves far more than simply starting the engine. It’s a detailed, step-by-step process that includes:
Once all systems have passed initial checks, we begin the critical phase of turbine start-up. This phase is conducted with heightened attention to:
• Critical safety systems
• Load transitions and parameter tracking
• Real-time issue detection and response
Any irregularities are escalated immediately to our MFS Technical Support Team, enabling fast, expert-level analysis and resolution.
Following a successful start-up and validation of all systems, MFS provides a safe and structured handover of your unit to your operations team, including:
It is our mission to deliver a gas turbine system that is fully tested, safe to operate, and optimized for long-term performance, backed by expert support whenever you need it.
Ready for a smooth start-up?
Get in touch with MFS to discuss your project or commissioning timeline.
Our engineers have experience with both aeroderivative and heavy-duty gas turbines used in industrial and energy applications.
GE LM series
GE Frame series
Reduce turbine downtime and decrease your total cost of ownership.